China Gold Supplier for Automatic Cylinder Shot Blasting Machine
We thinks what buyers think, the urgency of urgency to act during the interests of a purchaser position of theory, allowing for much better high-quality, reduced processing costs, charges are more reasonable, won the new and outdated consumers the support and affirmation for China Gold Supplier for Automatic Cylinder Shot Blasting Machine, Through more than 8 years of business, we have accumulated rich experience and advanced technologies in the production of our products.
We thinks what buyers think, the urgency of urgency to act during the interests of a purchaser position of theory, allowing for much better high-quality, reduced processing costs, charges are more reasonable, won the new and outdated consumers the support and affirmation for Automatic Cylinder Shot Blasting Machine, Automatic Shot Blasting Machine, Shot Blasting Machine, We significantly promise that we supply all the customers with the best quality items, the most competitive prices and the most prompt delivery. We hope to win a resplendent future for customers and ourselves.
Rebar shot blasting machine consists of roller conveyor system, blasting system, abrasive circulation system (separator, bucket elevator, screw conveyor), dust collection system and electric control system. The surface finish level is Sa2.5.
Technology parameter: | ||
1 | The machine dimensions | See the drawing |
2 | Shot blasting chamber | Width1300mm X Height 500mm opening size |
3 | Max. workpiece size | 12000mm X (8-40)mm (Length X Diameter) |
4 | Max. workpiece weight | 500kg |
5 | Finish level | Sa2.5 (IS08501-01) |
6 | Surface roughness | 40~85 μ (Depend on abrasive size) |
7 | Noise | ≤95dB |
8 | Dust content after cleaning | 10mg/m3 |
If you’re interested in our style machine, welcome to contact us to get more detailed info.
DX HIGH PERFORMANCE TURBINE
FAQ:
1. The max. Length/Width/Height of the work pieces.
2. The productivity you need to blasting the work pieces ( how many tons or pieces per day or per month?).
3. The power supply you need( such as 380V, 3P, 50HZ).
4. The work pieces photo or drawing is better.
Based on this question, the detailed technical proposals will be sent to you for reference.