All shot blasting machines must comply with the following rules during the installation process:
1. The host is in place: the level and weight of the host must meet the drawing requirements when it is in place.
2. Sub-component installation should be carried out from bottom to top.
3, rail or catenary, roller type should be caused by the inside of the device.
4. Partial pre-test should be carried out during the test run, and then all running after normal operation.